Project Owner Assistance
Prevention, sprinkler and special-risk project support
From the definition of your safety objectives to the handover of installations, our experts support every phase of your fire protection projects.
Types of sites supported
RiskCare supports clients across all types of at-risk sites, factoring in the technical, regulatory and insurance constraints of each environment.
Logistics warehouses
Industrial and agricultural sites
Public-access buildings
Data centers
Commercial buildings
Fire protection
Secure fire protection decisions
RiskCare supports technical decisions to align safety objectives, project constraints and insurance requirements.

Technical expertise
A detailed technical view to secure your decisions and investments.
Fire protection
Security and malicious acts
Climate events
Renewable energy
Sprinkler project owner assistance
Manage projects methodically
From design to handover, POS support provides a clear framework for technical decisions and works monitoring.

Our support methodology
A clear framework with secured deliverables at each phase.
Definition of safety objectives
Specification review or drafting
Quote analysis and synthesis
Review of execution studies
Technical site visits
Support during acceptance
Support whatever the current project stage
Insurance-oriented approach to optimize budget and expected outcomes
Total independence from RiskCare
Technical follow-up
Control installations over time
A protection system’s performance also depends on its condition, compliance and documentation.
Project and AHJ support
From objective definition to final certification, we support every phase of your sprinkler installation project.
Study and advice
- • Needs analysis
- • Objective definition
- • APSAD R1 / NFPA 13
Design and tender
- • Technical specifications
- • Offer analysis
- • Execution-study monitoring
Works monitoring
- • Site meetings
- • Quality control
- • Progress monitoring
Handover and commissioning
- • Participation in tests
- • Performance validation
- • Compliance check
Compliance acceptance
- • CNPP certification
- • FM certification
- • Compliance file
30-year review
Full support for the 30-year review of your sprinkler systems: audit, investigation, works and compliance restoration.
Audit and advice
- • Complete condition review
- • Installation diagnosis
- • Recommendations
Investigation and study
- • Additional analyses
- • Specific tests
- • Feasibility study
Works definition and tender
- • Specifications
- • Offer analysis
- • Supplier selection
Works monitoring and handover
- • Works control
- • Technical validation
- • Final acceptance
Why a 30-year review?
After 30 years of operation, a sprinkler system must be reviewed to maintain effectiveness and compliance with current standards.
Special risks focus
Technical expertise where standard solutions stop
Chemicals, petrochemicals, flammable liquids and explosion risks require precise technical analysis and strong knowledge of international standards. These environments require unique installations, built to measure.

Special-risk support
From objective definition to handover support, we support every phase of your special-risk projects.
Tailored solutions
- • Analysis of site-specific constraints
- • Sizing based on the real risk
Sizing support
- • Laboratory-test support
- • Full-scale tests when needed
- • Product qualification before prescription
Total independence
- • Independent intervention
- • From audit to handover
- • Prescription based on your technical and insurance interests
Controlled systems
- • Foam systems
- • Deluge systems
- • Gas extinguishing systems
- • High- and low-pressure water mist
Our commitments
Special-risk expertise
Selection of the right protection systems
Support at every phase
Special-risk AMO
Make the right decisions
From design to handover, project owner assistance provides a clear framework for technical decisions adapted to buildings and activities.

PFAS transition: do not wait for formal notice
European PFAS restrictions require a review of fluorinated foams in many industrial installations. Poorly anticipated transition can compromise site protection and insurance compliance.
Foam audit
- • Identification of PFAS products
- • Inventory status
- • Priority transition scope
Alternative testing support
- • Evaluation of PFAS-free foams
- • Compatibility under representative risk conditions
Replacement specifications
- • Transition specifications
- • Compatibility with existing equipment
- • Sizing adaptation if required
Handover and documentation
- • Validation of new installations
- • Compliance file for insurers and authorities
A prevention project?
Our AMO experts support you from design through handover of your installations.